Back to Resources
🛁 Checklist 8 min read

Bathroom Renovation Checklist: A Complete Step-by-Step Guide for Australian Homeowners

A bathroom renovation is one of the most popular home improvement projects in Australia — and one of the most complex. Get it right with this complete checklist covering planning, trades, waterproofing, and finishing.

Why Bathroom Renovations Need a Checklist

Bathroom renovations involve multiple licensed trades working in a specific sequence. Skipping a step — like booking waterproofing before tiling — can cost thousands to fix. This checklist keeps every phase in order.

Step 1: Set Your Budget

A basic bathroom renovation in Australia starts at around $10,000–$15,000 for cosmetic changes and can reach $30,000+ for a full structural remodel. Always add 15–20% as a contingency buffer.

Pro tip: Budget for fixtures first, then work backwards to materials. Tapware and vanities have wide price ranges — set upper limits early.

Step 2: Planning and Design

  • 1 Measure your bathroom accurately and draw a rough floor plan
  • 2 Decide whether you want a cosmetic refresh or a full structural renovation
  • 3 Collect inspiration photos from Pinterest or Houzz to communicate your style to tradies
  • 4 Select your tiles, vanity, toilet, shower, bath (if including one), and tapware before booking trades

Step 3: Waterproofing — The Critical Step

In Australia, waterproofing in wet areas must be done by a licensed waterproofer and must comply with AS 3740. This step happens before tiling. Skipping or under-doing it is the #1 cause of building defects in Australian bathrooms.

⚠️ Watch out: Waterproofing must be done by a licensed professional — not a DIY job. Ensure they provide a certificate of compliance.

Step 4: Trade Sequence

  • 1 Plumber: rough-in before waterproofing
  • 2 Waterproofer: membrane applied and cured before tiling
  • 3 Electrician: lighting, exhaust fan rough-in
  • 4 Tiler: after waterproofing is fully cured
  • 5 Plumber (return): final fit-off
  • 6 Electrician (return): install fittings

Step 5: Final Checks

  • 1 Vanity, mirror, and accessories installed after tiling
  • 2 Silicone all wet area joints
  • 3 Final clean and inspection
  • 4 Check all fixtures for leaks

Pro tip: Take detailed 'before' photos for insurance and future reference.

Ready to get started?

Connect with verified local tradies who can help bring your project to life.